The car is over getting the roll cage installed, along with a lot of the rest of the fabrication work required. Left and right side window nets, battery shutoffs, fuel system, fire system. The days are counting down.
Tuesday, February 23, 2010
Subscribe to:
Post Comments (Atom)
No comments:
Post a Comment